Rainwater Catchment – FILDRAVO INSIGHTS

Image Source: Reuters As our planet faces the increasing challenges of climate change, the need for sustainable solutions has never been more urgent. One such solution, often overlooked, is rainwater catchment. By harnessing the natural resource of rainwater, we can conserve precious water, reduce our environmental impact, and enhance our resilience to water scarcity. The […]

Rainwater Catchment – FILDRAVO INSIGHTS Read More »

FILDRAVO’s Strong Commitment to Sustainability

Image Source: Reuters The devastation caused by recent floods in Rio Grande do Sul, Brazil, tragically underscores the urgent need for infrastructure that can withstand the growing threats posed by climate change. Here in the Philippines, where vulnerability is a constant reality, building resilience is not just a necessity, it’s a responsibility.  The Philippines holds

FILDRAVO’s Strong Commitment to Sustainability Read More »

Why Hire CMS?

Construction is a critical process, and it is essential for clients to have a design in place before selecting a contractor. Issues and problems often arise once construction begins, leading to project delays, cost overruns, and low-quality work. To address these challenges, external consultants providing construction management services or project management are highly recommended. The primary

Why Hire CMS? Read More »

Sener and FILDRAVO Sign an Agreement to Offer Offshore Wind Engineering Services in the Philippines

The engineering and technology group Sener and FILDRAVO, a leading architecture engineering consulting company in the country, signed a memorandum of understanding to jointly offer engineering services for offshore wind projects in the Philippines, leveraging Sener’s global experience in the industry and FILDRAVO’s local expertise, promoting sustainable projects that impact positively in the community. Sener,

Sener and FILDRAVO Sign an Agreement to Offer Offshore Wind Engineering Services in the Philippines Read More »

The Problem with NFCC

Government agencies use Net Financial Contracting Capacity (NFCC) during bidding to ensure contractors have the capacity to complete an infrastructure project. However, challenges arise after the project has been awarded when the contractor simultaneously gets other projects with no monitoring of the NFCC. This is a significant gap in the government’s contract implementation guidelines since

The Problem with NFCC Read More »

Two Strand Continuous Billet Casting Facility

The project was a 2-strand continuous billet casting facility with a production output capacity of 108,000 MT per year. Fildravo provided detailed engineering design and construction management services for the following: Concrete building foundation and its superstructure. Concrete foundation for equipment. Water treatment plant building, including tanks, pumps, and equipment foundations. Generator foundations and substation.

Two Strand Continuous Billet Casting Facility Read More »

Gardenia Bakery Philippines Plant

Gardenia Bakeries was among the foreign investors who responded to President Fidel V. Ramos’ invitation to establish business operations in the Philippines in support of Philippines 2000. The company undertook the production of a specific variety of high-quality bread, which would soon be made accessible to the Philippine market. The establishment of the bakery was

Gardenia Bakery Philippines Plant Read More »

Manila Bay Reclamation Project

The Manila Bay Reclamation Project aims to transform a vast area of land into a sustainable and vibrant urban development. This technical report presents the findings and outcomes of the feasibility studies conducted by Fildravo for the project. The study covers various aspects, including urban planning, engineering, environmental impact, socio-economic considerations, and financial viability. Additionally,

Manila Bay Reclamation Project Read More »

Manila Gold Coast Reclamation Project

The Manila Goldcoast Reclamation Project, a significant undertaking along the Manila Gold Coast, involved the reclamation of 161 hectares of raw land. This technical document highlights the role of Filipinas Dravo Corporation as the appointed consultant responsible for executing the Detailed Engineering Design. By adhering to the requirements of the Philippine Reclamation Authority, the project

Manila Gold Coast Reclamation Project Read More »